Business connectivity
Business leased lines: a private connection that is yours alone
A leased line is a dedicated fibre circuit between your premises and the network. Nobody else shares it, the speed is the same in both directions, and the repair time is written into the contract. This guide explains how one works, what it involves, and how to tell whether your business needs it.
- Shared with others?
- No. 1:1, uncontended
- Speeds
- Symmetric, typically 100Mbps to 10Gbps
- Service level
- Contracted uptime and fix times
- Typical lead time
- Weeks to months, survey dependent
What is a leased line?
Most broadband is a shared service. Your traffic joins everyone else's on the way to the exchange, and the upload speed is a fraction of the download speed. A leased line removes both compromises. It is a fibre Ethernet circuit installed for one customer, running from a termination unit in your comms room directly into the carrier's core network.
Three things follow from that design:
- Uncontended. The capacity you order is reserved for you at all hours. A 200Mbps line delivers 200Mbps at 9am on a Monday.
- Symmetric. Upload matches download, which matters for cloud backups, video calls, hosted phone systems and remote CCTV viewing.
- Backed by a service level agreement. Uptime targets and repair times are contractual, usually measured in hours, with service credits if the carrier misses them.
Our earlier article, Why use a dedicated leased line?, covers the business case in more depth.
Bearer and bandwidth: the two numbers on every quote
Leased line quotes show two speeds, and they are often misread. The bearer is the size of the physical circuit, usually 1Gbps or 10Gbps. The bandwidth is the speed you commit to within it, for example 200Mbps on a 1Gbps bearer.
The gap between them is your headroom. If your needs grow, bandwidth can be raised up to the bearer size without new engineering work. Choosing a bearer with room to grow is usually a better decision than choosing the largest bandwidth on day one. Flexible products that let you change bandwidth during the term are explained in What is a Fibre Flex leased line?
Leased line vs FTTP vs SoGEA
| Leased line | FTTP (full fibre) | SoGEA (part fibre) | |
|---|---|---|---|
| Connection | Dedicated fibre to your premises | Shared fibre to your premises | Fibre to the cabinet, copper to you |
| Contention | None | Shared with other users | Shared with other users |
| Upload speed | Equal to download | Usually lower than download | Up to around 20Mbps |
| Repair commitment | Contracted fix time in hours | Best effort, enhanced care available | Best effort, enhanced care available |
| Installation | Survey and build, weeks to months | Usually a single engineer visit | Often no visit needed |
| Suits | Sites where an outage stops work | Most small and mid-sized offices | Sites full fibre has not reached |
Who needs a leased line?
The honest answer is not everyone. Full fibre serves many offices well. A leased line earns its place when one or more of these is true:
- Your phones run over the internet, through hosted VoIP, SIP trunks or Teams Phone, and a dropped line means missed calls.
- Staff upload as much as they download: design files, medical imaging, backups, video.
- You host anything customers or other sites connect to, such as a server, a VPN or a CCTV recorder.
- Several sites depend on one head office connection.
- You need a commitment in writing about how fast a fault will be fixed.
If slow WiFi is the complaint, check the cause before upgrading the line. Our guide to the difference between broadband and WiFi explains how to tell the two apart.
What installation involves
A leased line is built to order, so it takes longer than broadband. The usual sequence is a desktop check, a site survey, any civil work needed to bring fibre into the building, then installation and testing.
- Survey. The carrier confirms the route from the nearest fibre node to your comms room.
- Excess construction charges. If new ducting or digging is required, the carrier quotes for it after survey. You can accept, ask for another route, or cancel.
- Wayleave. In a leased or multi-tenant building the landlord normally has to consent to the work. Starting that conversation early prevents the most common delay.
- Handover. The circuit is tested and handed over with a managed router, static IP addresses and monitoring.
We run this process for you, including the landlord paperwork, and keep the existing connection live until the new one is proven.
Building in resilience
A leased line is reliable, but a single circuit is still a single point of failure. A digger through a duct takes out any fibre. Options, in rising order of protection:
- 4G or 5G failover on the router, enough to keep phones and card payments running.
- An FTTP or SoGEA backup line that takes over automatically.
- A second leased line on a diverse route, entering the building at a different point, ideally from a different carrier.
How to check what you have today
Before any conversation about upgrades, measure the current line. Plug a laptop into the router with a cable and run Ookla Speedtest a few times across the working day. Note download, upload and ping. Compare the results with the speed on your contract. Ofcom's broadband and mobile checker shows which services are available at your postcode.
For a full picture we carry out a site visit, test on the wired network and on WiFi, and report what the connection and the internal network are each contributing.
Your questions answered
Leased lines: frequently asked questions
How long does a leased line take to install?
It depends on the survey. Where fibre is already close to the building, a few weeks is realistic. Where new ducting or a landlord wayleave is needed, allow two to three months. We give you a dated plan after the survey and keep your current service running until handover.
Is a leased line faster than full fibre broadband?
Not always on headline download speed. The difference is consistency and upload. A leased line delivers the contracted speed in both directions at all times, with a contracted repair time. Full fibre broadband is shared and usually has a lower upload speed.
What speed leased line does my business need?
It depends on the number of users, the applications in use and how much is uploaded. As a starting point we look at concurrent calls and video meetings, cloud backup volumes and any hosted systems, then recommend a bandwidth with headroom on a larger bearer.
Can I get a leased line anywhere in Scotland?
In principle, yes, because the circuit is built to your premises. Rural and island sites may involve longer lead times and construction charges. We check carrier availability and likely build costs before you commit.
Do I still need a backup connection?
We recommend one. A leased line has a strong repair commitment, but repair still takes time. A 4G or 5G failover or a secondary broadband line keeps phones and payments working during a fault.
Further reading
Guides and independent sources
- COLABR8 blogWhy use a dedicated leased line?
- COLABR8 blogWhat is a Fibre Flex leased line?
- COLABR8 blogWhat's the difference between broadband and WiFi?
- OfcomCheck broadband availability at your postcode
- OfcomYour rights as a business telecoms customer
- Ookla SpeedtestTest your current connection
Related services
Talk it through
Ready to get Leased lines right? Speak to an expert today
No call centres. You speak directly with a UK-based business expert who will look at what you have, explain your options plainly and manage the change for you.